MAIN WORK PERFORMED AND PURCHASES IN 1999: osmosis treatment, replacement axle box, landing with engine replacement and revision silent-blocks, interior paint, replacement rudder bushings, pole Nemo radar, halyards and sheets in spectra, staysail forestay for storm jib, radar, GPS, autopilot, jennaker, boiler, solar panels, satellite EPIRB.
PURCHASES AND WORK DONE FROM 2000 TO 2002: new windlass, new tender (now repaired), bowsprit, new additional tank fresh water, electric head
(engine to be replaced).
PURCHASES AND WORK DONE IN 2003: landing mast for verification rigging, interior paints, new mainsail and genoa cruise U & K, new stereo CD, new wind station Raytheon, sealing windows Plexiglas, interior upholstery and external cushions, new outboard for tender.
WORK DONE IN 2008: depth sounder and log Raytheon, motor electric head.
WORK DONE IN 2009: new engine Volvo Penta D1-30, propeller regeneration max-prop, hull brought to zero and two coats of epoxy osmosis; new hood and lazy bag; galvanizing CQR anchor and chain.
WORK DONE in 2018: Teak deck 12 mm.
Disassembled, sandblasted and powder-coated winches supports.
Complete service to all the winches with replacement of all the clips.
Disassembled, polished, reassembled and waterproofed windows on deckhouse.
Same for sliding panel panel
New engine batteries and services
Protective bolt treatment and keel fastening structure
Review of bilge pumps with membrane replacement
Revised w.c. engine electric
Revised anchor winch
Painting all the paioli, dinette table and table base
Hull polishing and writing repainting
New safety equipment
Visit Rina and make safety notes.
Replaced shaft propeller root sleeve
Replaced shaft cap
service to all systems, tank tube replacement and gas valves engine service and diesel tank cleaning service to all sea outlets
replace two sea jacks
service propeller max prop
service wheelhouse
boat in water sailing in Naples – Mergellina